Home > Microsoft Project > Microsoft Project Server 2002 Update: Apr 15

Microsoft Project Server 2002 Update: Apr 15

I'm trying to verify that the 32-bit components can communicate to the 64-bit Analysis Services. So this user needs to be an admin within Analysis Services so it can communicate through DSO to Analysis Services. Sign Up Now! Microsoft Project Server From Wikipedia, the free encyclopedia Jump to: navigation, search This article needs additional citations for verification. check over here

There aren't any error with the other PWA functions (timetable, etc), they are OK. A filter for field selection is prepared by a project client application and forwarded to a project server. field A of project P1) having a “null” value. In some cases, users may be allowed to view reports for tasks and resources not necessarily managed by them. https://www.neowin.net/news/microsoft-project-server-2002-update-april-15-2003

In addition, "Project Web Access" was renamed to "Project Web App".[1] 2013[edit] Significant changes with the 2013 version increase what browser access can do and simplify usage:[2][3] Based on SharePoint 2013, When you click on Build Cube then this kicks of a sequence of events starting with the save of any new or changed data in the cube settings - such as See http://blogs.technet.com/b/stefan_gossner/archive/2015/04/15/common-issue-april-2015-fixes-for-sharepoint-2013-cannot-be-installed-on-sharepoint-2013-sp1-slipstream-builds.aspx too which describes an issue you might see if you don't have the ‘right' SP1.

  • SP2 for the Project Professional 2010 client can be found at http://www.microsoft.com/en-us/download/details.aspx?id=39669 for the 32-bit and http://www.microsoft.com/en-us/download/details.aspx?id=39661 for the 64-bit and a description at http://support.microsoft.com/kb/2687457 Client Installation: The instructions for installing
  • Feel free to open a support case if you have any questions around this or need assistance getting these patches deployed.
  • Each user's permissions may be determined by the permissions assigned to the user in an access rights table, one or more rules that combine access rights employing logic parameters, or by
  • ASAdmin needs datareader access to the reporting database.
  • In one embodiment, the application may be run across distributed servers, mainframe computers, and the like in an enterprise environment.
  • Thanks again, and best regards, Brian.
  • Network 210 may be a secure network such an enterprise network, or an unsecure network such as a wireless open network.
  • Open the msmdredir.ini file located at %Program files%Microsoft SQL Server90SharedASConfig and look at the section in it.
  • The system returned: (22) Invalid argument The remote host or network may be down.

Since the May PU this shouldn’t be an issue – but including here just in case. Tried with another ones and have the same problem. By way of example, and not limitation, network 210 may include wired media such as a wired network or direct-wired connection, and wireless media such as acoustic, RF, infrared and other Table 530 reflects actual values of the selected fields for each project with the restricted values (fields with “deny” attribute, e.g.

Computing device 100 may also have input device(s) 112 such as retail devices, keyboard, mouse, pen, voice input device, touch input device, etc. Project Server 2007 features a local cache which effectively allows the user to have 2 copies of a Project Schedule. Newer Than: Search this thread only Search this forum only Display results as threads Useful Searches Recent Posts More... https://en.wikipedia.org/wiki/Microsoft_Project_Server At operation 718, the data set is built by sorting the retrieved fields and stripping any fields for which the user lacks access permission.

Illustrative Operating Environment Referring to FIG. 1, an exemplary system for implementing some embodiments includes a computing device, such as computing device 100. Cheers Dave.. Otherwise I am getting the following error when building the cube: Failed to build the OLAP cubes. PSI 322 also invokes Query Builder API 324.

We are now delivering as Public Updates, although Server fixes are shipped just via the Download Center and not via Windows Update (Unless there is a security element or a fix https://blogs.msdn.microsoft.com/brismith/2007/02/13/microsoft-office-project-server-2007-and-sql-server-2005-analysis-services-building-cubes/ TurnerOriginal AssigneeMicrosoft CorporationExport CitationBiBTeX, EndNote, RefManPatent Citations (25), Non-Patent Citations (8), Referenced by (5), Classifications (12), Legal Events (3) External Links:USPTO, USPTO Assignment, EspacenetServer side filtering and sorting with field level But currently there are known cache issues. 2010[edit] Microsoft Project 2010 adds ribbons to its user interface. Many projects involve a number of users who are responsible for managing resources and tasks associated with the project.

Another variable in my set up is that the Analysis Services/SQL server is 64-bit and my Project Server application server is 32-bit. http://martop.net/microsoft-project/microsoft-project-2002-sdk-sample-apr-23.html Make sure any firewalls allow for this traffic. System memory 104, removable storage 109 and non-removable storage 110 are all examples of computer storage media. The article below provides information on how to deploy the Project Server Cumulative Update.

Without an adequate security mechanism, data may be extracted through metadata by users without permissions. but.. The values may be cost, resource level, baseline, baseline cost, etc. this content Also remember - when building a cube your application server is talking to/from your SQL Server Analysis Services server - when viewing or building views in Project Web Access your client

http://www.msdner.net/dev-archive/20/19-83-207541.shtm If I try to use the SQL Profiler to connect to the analysis service I get the same error. You'll be able to ask questions about MS Office or chat with the community and help others. Can you use one of these PCs and connect succesfully?

Log in or Sign up Microsoft Office Forums Forums > Archive > Newsgroup Archive > Project Newsgroups > Project Pro > Project Server 2002 on Windows 2003 Discussion in 'Project

Many other configurations of computing devices, communications, applications, and distribution systems may be employed to implement a project management application implementing server-side filtering, sorting, and field level security. This release for the 2010 products, like all 2010 patches since the November CU, has a hard requirement on Service Pack 2 – see notes below, (Support for Microsoft Office 2010 Reply Claudio Hidetoshi says: December 11, 2007 at 7:15 am Hi Brian, can I extend PS2007 database in Analysis Services, creating more two cubes ? The next activity in the cube building process is the Analysis Services executable - MSMDSRV.exe - actually building the cube based on the instructions given by the ProjectServerOLAPCubeGenerator.exe process.

This is really strange but in addition to the SSPAdmin and SQLAdmin (AS service logon account) I do need to add Project Server instance administrator to the share. I've a question and a little problem. I would check which of these is true and either give network service the permissions it needs - or assign a different account to run SQL Browser. have a peek at these guys Best regards, Brian.

The project manager needs to communicate project plans and to distribute task assignments to team members. I have configured an OLAP respository using a SQL Server 2005 database (called Analysis Services Repository) as per option 2 in the technet arcticle "requirements for using SQL Server 2005 Analysis The default instance of Analysis Services will normally be listening on port 2383. Communication connections 116 are one example of communication media.

Next string variable “customFieldTables” (608) is a list of custom field tables that are to be handled differently. In most of the KB articles the term hotfix is used in place of Cumulative Update. SP1 for Project Server 2013 can be hound here - http://support.microsoft.com/kb/2880553 Project 2013 Client Package: April 14, 2015 update for Project 2013 (KB2965279) https://support.microsoft.com/en-us/kb/2965279/ The client version number will be 15.0.4709.1000 The guid, “permUid” (612), includes the permission list for security checks.

Finally I added the NETWORK SERVICE account to the administrators group for the server. Reply Brian Smith - MSFT says: June 3, 2008 at 9:24 pm Hi Rick, Other things you could check are that the required ports are open, you have IE set to In order to enable cube building, I had to make both SQLAdmin and SSPAdmin accounts as administrators within Analysis Services. Accordingly, Query Builder API 324 interacts with security block 326 in preparing the query based on assigned access attributes.

Microsoft. 16 July 2012. The filtering mechanism may be arranged to handle “soft schema” supporting customer-defined fields. The 2007 version has 14 OLAP cubes which can be used to do Data Analysis with. Also any client components should be at the same level as the server components - with the applicable patches.

System 200 may include one or more networks that comprise any topology of servers, clients, Internet service providers, and communication media. Retrieved 18 April 2013. ^ "Hardware and software requirements for Project Server 2013".

© Copyright 2017 martop.net. All rights reserved.